SBEM Calculations
New non-domestic buildings need SBEM Calculations as per the requirements of Part L of the Building Regulations (or Section 6 if your in Scotland). Some large extensions will also require SBEM Calculations.
SBEM Calculations consider the build fabric, insulation, air tightness and services (space heating, hot water, ventilation, lighting and renewables) of the building, compared against notional targets of Part L of the Building Regulations.
At Energytest, we don't just run the assessment - we work alongside your design team to ensure your project achieves compliance seamlessly, cost effectively, and on time.

Newly Constructed Buildings
New non-domestic buildings need SBEM Calculations for compliance with Approved Document L. Design stage SBEM calculations must be submitted prior to starting on site. As-built SBEM calculations are submitted post construction, alongside the Energy Performance Certificate (EPC).
Change Of Use Conversions
Where there is a material change of use in a non-domestic building - then SBEM calculations are required. This is also a two stage process, requiring design stage and as-built SAP submissions. An EPC can be issued post construction.
Large Extensions
Approved Document L defines a large extension as an extension which has a total useful floor area that is both:
-
greater than 100sqm, and
-
greater than 25% of the floor area of the existing building
Large extensions are regarded as new buildings and therefore require SBEM calculations. An EPC can be issued post construction.
All of our SBEM assessors are NDEA qualified and bring a wealth of experience to your project. Our service includes all the support required to ensure compliance is achieved through the most practical and cost-effective solution.

Why Choose Energytest
Qualified
Experienced
Competitive
Fast turnaround times at a competitive price
Comprehensive advice and support from experienced consultants
Fully qualified and accredited assessors across all services
